Here are the absolute latest of the floor/ceiling structure for the concrete.  It looks quite different than when we left the site.


Also - here is an excerpt from an email I got regarding Silvestre.  Please be praying for him as he recovers AND works at the same time.

"We've had a few setbacks: Last Friday Silvestre was putting in the wooden braces/frames in the Sunday school rooms in preparation to pour the ceiling when he felt one give way. He grabbed something so he wouldn't fall, but he lost his balance anyway and cut his left palm from the little finger down about half way on his hand on tin roofing. It required 7 stitches and a tetanus booster shot. Would he go home and rest? Noooooooooooo! After we took him back to the work site he started in again working with a stitched bandaged hand! "


There was also an "inspector" show up and tell them that they had to put a post under each of the beams that were set to help support them when the building contracts and expands due to the heat.  They are not all that excited about that as it takes away from the "big space".

They are figuring  on permanently being in the building in a few months and pouring the concrete on the ceiling this Saturday.

PRAISE GOD !!!!